References
Reference list of our key clients — over 100 satisfied clients from the energy sector, industry, hospitality and the public sector.
72references
Chemical cleaning of thermal and energy facilities and installations
33 references
TENT B1 and B2
Acid cleaning of the evaporator section of a 600 MW boiler, in cooperation with ENERGOTECHNIKA-ENERGOROZRUCH – RAFAKO, Poland
RiTE Ugljevik
Acid cleaning of MP1 and MP2, in cooperation with ZK TERMOCHEM, Prague, Czech Republic
New Smelter RTB Bor
Acid cleaning of the waste heat boiler – WHB Foster Wheeler heat recovery unit, in cooperation with Energoprojekt Oprema
Petrohemija Pančevo
Chemical cleaning – acid cleaning of two 80 t/h boilers, in cooperation with CWG Belgrade
Belgrade Paper Mill
Acid cleaning of the Đuro Đaković 25 t/h steam boiler
RB Kolubara doo – Vreoci Processing Branch
Acid cleaning of two 70 t/h steam boilers
TENT B Obrenovac
Cleaning and preservation of MP pipes before installation on the unit 1 and unit 2 boilers, in cooperation with VIA OCEL Belgrade
TENT A Obrenovac
Acid cleaning of unit 6 pipes and tube bundles before installation, in cooperation with VIA OCEL Belgrade
Feromont
Cleaning and passivation of boiler pipes before installation for TPP Tuzla
Pančevo Oil Refinery
Chemical and hydro-mechanical cleaning of air coolers, acid cleaning of a 60 t/h steam boiler, chemical flushing of the S2100 exchangers
CB&I – SIM and BMR
Chemical cleaning and passivation of the hydrogen compressor piping in the new plant of the Pančevo Oil Refinery
Messer Tehnogas – Smederevo facility
Chemical cleaning of the air and nitrogen scrubbers
HBIS Serbia – Smederevo Steel Mill
Chemical and hydro-mechanical washing of VOKG air coolers, chemical washing of cooling towers and plate exchangers at RKL, acid cleaning of blast furnace valves
Toplifikacija Lazarevac
District heating system of the city of Lazarevac – chemical cleaning of plate and tubular exchangers
TPP Kostolac
Kostolac district heating system, exchangers at TPP Kostolac
TPP Kolubara Veliki Crljeni
Chemical cleaning of the water side of turbine condensers
RAFAKO Poland
Cleaning and preservation of part of the piping system at TENT B
Tigar Tyres Pirot
Chemical cleaning of the water installation of rollers, extruders and mixers, washing and preservation of the flue gas side of water-tube boilers, chemical washing and passivation of the water-steam side of the BOSCH package boiler
Cooper Tire Kruševac
Chemical cleaning of the water installation of rollers, extruders and mixers
Knauf
Chemical cleaning of the furnace cooling system in Surdulica
Niš District Heating Utility
District heating system of the city of Niš – chemical cleaning of plate and tubular exchangers
JKP Čačak
Heat exchangers, boilers
JKP Gornji Milanovac
District heating system, boilers, heat exchangers
Zastava Energetika Kragujevac
Kragujevac district heating system, exchangers, compressor intercoolers
National Bank of Serbia – Slavija building
Chemical cleaning of Carrier chiller condensers, overhaul and annual maintenance of Baltimor towers
Military Medical Academy Belgrade
Chemical cleaning of Carrier chiller condensers
Radio Television of Serbia
Chemical cleaning of chiller condensers, cooling tower overhaul
Hotel Slavija
Chemical cleaning of chiller condensers, cooling tower overhaul
Serbian Glass Factory Paraćin
Compressor coolers, vacuum pumps
Carnex Vrbas
Autoclaves
Sunce AD Sombor
Evaporative condensers, steam boiler
Dijamant Zrenjanin
Degreasing of the hot water heating system of the margarine plant, hydrogen compressor, evaporative condensers
MB Namenska Lučani
Extruder cooling system, LUVO air preheater, turbine condenser
Water treatment with corrosion and scale inhibitors and biocides
19 references
TPP-HP Pančevo
Cooling water treatment – with NALCO chemicals
RB Kolubara – Heating Plant
Boiler water treatment, first application of HELAMIN 90H Turb in Serbia
TPP Kolubara Veliki Crljeni
Cooling water treatment of the 110 MW system – NOVOHIB product
TPP Kostolac B
Application of NALCO carbohydrazide
Serbian Glass Factory Paraćin
Treatment of the complete cooling system
BW TC Galerija Belgrade
Cooling water treatment of the air conditioning system
Carlsberg Serbia – Čelarevo brewery
Cooling water treatment
CRH Popovac
Dijamant Zrenjanin
Tetra Pak Gornji Milanovac
Grundfos Inđija
Crowne Plaza hotel, Belgrade
SIV3 Belgrade
Military Medical Academy Belgrade
Gejzer Special Hospital, Sijarinska Banja
MB Namenska production Lučani
Puratos Kragujevac
Metalfer Sremska Mitrovica
Elixir Prahovo
Cooling tower overhaul
14 references
HBIS Serbia – Smederevo Steel Mill
Replacement of supports and 286 m³ of fill on cooling tower PS2/1, overhaul of two Baltimor FXV Q661-N towers, overhaul of TIM Laško towers 2/2
NIS Pančevo Oil Refinery
Replacement of the water distributor in four cooling tower sections
Messer Tehnogas – Smederevo facility
General overhaul of a Marley cooling tower – supply and installation of drift eliminators and fill, together with accompanying works on four cells of the cooling tower
Serbian Glass Factory Paraćin
Complete overhaul of the TIM Laško cooling tower, overhaul of fans and pumps, fill replacement on the Baltimor tower and polyester lining of the basin
IMPOL SEVAL
Complete overhaul of four Baltimor S3868 cooling towers
NIS
Complete overhaul of 5 cooling towers for the Belgrade headquarters and 2 cooling towers for the Novi Sad headquarters
MB Namenska
Complete overhaul of two Termofriz cooling towers
Crowne Plaza
Fill replacement on two Baltimor cooling towers as a subcontractor to Grappa, polyester lining of one Baltimor tower basin
RTS Belgrade
Fill replacement on the cooling towers of the Abardareva building
National Bank of Serbia
Overhaul of the cooling towers at the Slavija building
Hotel Slavija
Overhaul of the cooling towers at the new hotel building
Atelje 212
Cooling tower overhaul
FIAT automobili Srbija
Disassembly, washing and reassembly of fill and polyester lining of basins on 6 Baltimor TXV cooling towers
Nectar Bačka Palanka
Complete overhaul of an ILMED IMPAINT cooling tower, fill replacement on a cylindrical cooling tower, replacement of air deflectors on a DESCA cooling tower
Regular monthly cooling system service
6 references
FIAT automobili Srbija
Service of a system with 22 Baltimor towers – as a subcontractor to Grappa
Serbian Glass Factory Paraćin
Service of a system with three Evapco, two Baltimor and one overhauled TIM Laško tower
Grundfos Serbia Inđija
Service of a system with two Baltimor cooling towers
National Bank of Serbia
Service of a system with three Baltimor towers
Crowne Plaza
Service of a system with two Baltimor towers
BW TC Galerija
Regular seasonal service of 12 B.A.C. cooling towers
Become our next reference
Contact us for a free consultation and an assessment of your equipment.