1.  “Pickling” of new boilers or parts of the piping system before commissioning.
  2. Chemical cleaning, “pickling” of high pressure steam boilers.
  3. Chemical cleaning of thermal power and thermo technical facilities on the water side from the deposit of carbonate, silicate, sulphate or iron oxide composition:
  • Steam boilers of medium and low pressure,
  • hot water and warm-water boilers,
  • supply, infeed reservoirs,
  • boilers for sanitary water,
  • heat exchangers (steam-water, water-water, oil-water)
  • shell and tube condensers,
  • evaporative condensers – cooling towers of ammonia cooling system in cold storages,
  • compressor cooling installations,
  • compressor oil refrigerators,
  • all objects where there is deposition of lime scale and Fe oxides.